Part 1: Interview with DWR's Joel Ledesma
Joel Ledesma, Deputy Director of the State Water Project, talks to Senior Investigative Reporter Stephen Stock about decision-making during the spillway collapse in February. He also discusses safety concerns raised by former state engineers, including the cracking trunnion rods that maneuver the radial gates and a crack on gate eight of the flood control structure.